MP-010 / About

We build inside buildings that stay open

Miltons of Pimlico Ltd is a London building contractor based on Page Street, SW1. We run refurbishment, fit-out and structural projects across London, with our own trades and one contracts manager on each job.


MP-011 / Story

Delays are rarely a construction problem

They are coordination problems. A steel that arrives before the opening is ready. A classroom released two days late. A subcontractor whose diary was never really ours.

The company was built to remove that risk. We employ our trades rather than book them, we hold one contracts manager per project from tender to handover, and we phase work around the people still using the building. It is a slower company to grow and a faster company to programme.

Most of our work now comes from clients who have used us before, or from consultants who have watched us on someone else's job.

Company
Miltons of Pimlico Ltd · no. 09807022
Incorporated
3 October 2015 · England & Wales
Registered office
20 Edric House, Page Street, London SW1P 4ER
Stripped interior of an occupied office undergoing phased refurbishment

MP-012 / Values

Three commitments we hold ourselves to

01 / Pricing

We price what we can see and name what we cannot

Provisional sums are declared on the face of every quotation, with the trigger that would release them.

Provisional sums declared separately in every quotation.

02 / Continuity

The person who prices it stays on it

Your contracts manager at tender is your contracts manager at handover. No transfer, no reintroduction.

One named contracts manager from tender to handover.

03 / Finishing

Snagging starts at first fix, not at handover

Site managers run a rolling defects list from the first week, so practical completion is a formality rather than a negotiation.

Inspection at every stage, with a 12-month defects period.

MP-013 / Health & safety

Occupied sites set the standard

Half our work happens within metres of pupils, staff or residents. Our safety procedure is written for that condition and then applied everywhere else.

  • Risk assessments and method statements issued before mobilisation, not on the first morning.
  • Physical segregation, dust suppression and noise windows agreed with the client in writing.
  • DBS-checked operatives on every education site, with a signing-in protocol agreed with the school.
  • Daily briefing at the start of each shift; weekly site inspection recorded and issued.
  • SMSTS-qualified site managers; CSCS-carded operatives throughout.
Scaffold and hoarding segregating live works from an occupied building

MP-014 / Team

Small enough to know every job

Our own trades, one office in Pimlico, and a cap on how many projects each contracts manager runs at once.

Carpenters, brickwork, plastering, decorating, groundworks, roofing, general labour, plant and site management are ours. Mechanical, electrical and specialist structural design are brought in from a fixed panel of consultants we work with regularly.

Projects per manager
3 maximum
Point of contact
One contracts manager

MP-015 / Process

Consultation to completion

01

Consultation

We walk the building with you, agree what has to stay in use and identify the constraints that will drive the programme.

Booked within 2 working days of your enquiry

02

Survey & quotation

Measured survey, then an itemised quotation with provisional sums declared separately. Free, and yours to take elsewhere.

Returned within 5 working days

03

Pre-construction

Programme, phasing plan, risk assessments and method statements, permits, and the protection strategy for occupied areas.

Typically 2–3 weeks before mobilisation

04

On site

One contracts manager, one site manager, one number to call. A written progress report every week, against the programme you signed.

Weekly report · single point of contact

05

Handover & aftercare

O&M manuals, test certificates, as-built information and a joint inspection. Defects are closed out before you chase them.

Snags closed within 14 days · 12-month defects liability

MP-016 / Next step

Walk us round the building

Consultations are booked within two working days. Bring drawings if you have them; we can work from the building if you do not.